Name: | AL-BCC Construction, Inc. |
Jurisdiction: | Alabama |
Legal type: | Foreign Corporation |
Status: | Exists |
Date of registration: | 09 Oct 2006 (18 years ago) |
Entity Number: | 000-935-755 |
Register Number: | 000935755 |
Historical Names: |
ZMG Construction, Inc.
|
ZIP code: | 36104 |
County: | Montgomery |
Place of Formation: | Florida |
Principal Address: | 1991 INDUSTRIAL DRIVEDELAND, FL 32724 |
Registered Office Street Address: | 2 NORTH JACKSON STREET, SUITE 605MONTGOMERY, AL 36104 |
Name | Role | Address |
---|---|---|
C T CORPORATION SYSTEM | Agent | 2 NORHT JACKSON STREET SUITE 605MONTGOMERY, AL 36104 |
Event Date | Event Type | Old Value | New Value |
---|---|---|---|
2023-12-01 | Name Change | ZMG Construction, Inc. | AL-BCC Construction, Inc. |
Inspection Nr | Report ID | Date Opened | Site Address | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
343562963 | 0418300 | 2018-10-29 | 2923 GALLANT DRIVE, BIRMINGHAM, AL, 35215 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Type | Referral |
Activity Nr | 1394220 |
Health | Yes |
Type | Inspection |
Activity Nr | 1357206 |
Health | Yes |
Violation Items
Citation ID | 01001A |
Citaton Type | Serious |
Standard Cited | 19260051 F01 |
Issuance Date | 2019-01-18 |
Abatement Due Date | 2019-01-29 |
Current Penalty | 6596.0 |
Initial Penalty | 6596.0 |
Final Order | 2019-02-25 |
Nr Instances | 1 |
Nr Exposed | 10 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.51(f)(1): The employer did not provide adequate washing facilities for employees engaged in the application of paints, coating, herbicides, or insecticides, or in other operations where contaminants may be harmful to the employees. Such facilities shall be in near proximity to the worksite and shall be so equipped as to enable employees to remove such substances: a) On or about 10/29/18 - ValleyBrook Apt. worksite, provisions were not made for employees to have potable water for washing of face and hands while engaged in asbestos removal activities. |
Citation ID | 01001B |
Citaton Type | Serious |
Standard Cited | 19260051 F03 II |
Issuance Date | 2019-01-18 |
Abatement Due Date | 2019-01-31 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-02-25 |
Nr Instances | 1 |
Nr Exposed | 10 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | CFR 1926.51(f)(3)(ii): Each lavatory was not provided with hot and cold running water, or tepid running water: a) On or about 10/29/18 - ValleyBrook Apt. worksite, water was not provided at the portable toilet(s) for hand washing. |
Citation ID | 01002A |
Citaton Type | Serious |
Standard Cited | 19260051 F03 III |
Issuance Date | 2019-01-18 |
Abatement Due Date | 2019-01-31 |
Current Penalty | 5497.0 |
Initial Penalty | 5497.0 |
Final Order | 2019-02-25 |
Nr Instances | 2 |
Nr Exposed | 10 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.51(f)(3)(iii): Hand soap or similar cleansing agents was not provided: a) On or about 10/29/18 - ValleyBrook Apt. worksite, soap was not provided at the portable toilet(s) for handwashing. |
Citation ID | 01002B |
Citaton Type | Serious |
Standard Cited | 19260051 F03 IV |
Issuance Date | 2019-01-18 |
Abatement Due Date | 2019-01-31 |
Current Penalty | 0.0 |
Initial Penalty | 0.0 |
Final Order | 2019-02-25 |
Nr Instances | 1 |
Nr Exposed | 10 |
Related Event Code (REC) | Referral |
Gravity | 5 |
FTA Current Penalty | 0.0 |
Citation text line | 29 CFR 1926.51(f)(3)(iv): Individual hand towels or sections thereof, of cloth or paper, air blowers or clean individual sections of continuous cloth toweling, convenient to the lavatories, were not provided: a) On or about 10/29/18 - ValleyBrook Apt. worksite, hand towels were not provided at the portable toilet(s) for drying hands. |
Date of last update: 17 Aug 2024
Sources: Alabama Secretary of State