Search icon

Cherokee Nitrogen Holdings, Inc.

Details

Name: Cherokee Nitrogen Holdings, Inc.
Jurisdiction: Alabama
Legal type: Foreign Corporation
Status: Merged
Date of registration: 19 Sep 2000 (24 years ago)
Entity Number: 000-918-325
Register Number: 000918325
Historical Names: Cherokee Nitrogen Company, Inc.
ZIP code: 36104
County: Montgomery
Place of Formation: Oklahoma
Principal Address: 16 S PENNSYLVANIA AVEOKLAHOMA CITY, OK 73107
Registered Office Street Address: 150 S PERRY STMONTGOMERY, AL 36104

Agent

Name Role
CAPITOL CORPORATE SERVICES INC Agent

Events

Event Date Event Type Old Value New Value
2003-12-08 Name Change Cherokee Nitrogen Company, Inc. Cherokee Nitrogen Holdings, Inc.

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
337423214 0418300 2012-11-14 1080 INDUSTRIAL DRIVE, CHEROKEE, AL, 35616
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2013-05-10
Emphasis N: CHEMNEP
Case Closed 2013-06-06

Related Activity

Type Referral
Activity Nr 661431
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19100119 J02
Issuance Date 2013-05-10
Current Penalty 6300.0
Initial Penalty 6300.0
Final Order 2013-06-06
Nr Instances 1
Nr Exposed 8
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(j)(2): The employer did not implement written procedures to maintain the on-going integrity of process equipment: (a) On or about 3/7/13 - at the No. 2 Nitric Acid Plant, the written procedure, "Nitric #9 Converter Installation" dated 1/20/86, was not implemented for proper bolt tightening when changing the platinum catalyst gauze at the 212-A converter (top hat) and converter elbow flange.
Citation ID 02001
Citaton Type Other
Standard Cited 19100119 J04 IV
Issuance Date 2013-05-10
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2013-06-06
Nr Instances 1
Nr Exposed 8
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.119(j)(4)(iv): The employer did not document each inspection and test that was performed on process equipment: (a) On or about 3/7/13 - at the No. 2 Nitric Acid Plant, documentation was not available for PSV-001 and -002 on the High Pressure Condenser (9-223-C1). (b) On or about 3/7/13 - at the No. 2 Nitric Acid Plant, documentation was not available for PSV-003 and -004 on the Coolant Chiller for Frick (9-223-C2). (c) On or about 3/7/13 - at the No. 2 Nitric Acid Plant, documentation was not available for PSV-005 and -006 on the Coolant Chiller for Frick (9-223-F1). (d) On or about 3/7/13 - at the No. 2 Nitric Acid Plant, documentation was not available for PSV-007 and -008 on the Frick Compressor (9-223-J).
Citation ID 02002
Citaton Type Other
Standard Cited 19100147 C06 II
Issuance Date 2013-05-10
Abatement Due Date 2013-06-06
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2013-06-06
Nr Instances 1
Nr Exposed 9
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: (a) On or about 4/22/13 - at 1080 Industrial Dr., Cherokee, AL, the employer did not certify that periodic inspections had been performed.
Citation ID 02003
Citaton Type Other
Standard Cited 19100147 D01
Issuance Date 2013-05-10
Abatement Due Date 2013-05-22
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2013-06-06
Nr Instances 1
Nr Exposed 3
FTA Current Penalty 0.0
Citation text line 29 CFR 1910.147(d)(1): The authorized employee did not have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the method or means to control the energy before the authorized or affected employee turned off the machine or equipment: (a) On or about 11/13/12 - at Urea reactor 1303-D, the isolation package 1303-D (Urea Reactor) procedure #42IP006 dated 1/31/12, that was used in conjunction with a completed line breaking permit, did not inform employees of the magnitude of energy being controlled.

Date of last update: 16 Aug 2024

Sources: Alabama Secretary of State