Inspection Type |
Referral
|
Scope |
Partial
|
Safety/Health |
Safety
|
Close Conference |
2021-01-12
|
Emphasis |
N: AMPUTATE
|
Case Closed |
2022-02-18
|
Related Activity
Type |
Referral |
Activity Nr |
1686989 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Other |
Standard Cited |
19100147 C04 I |
Issuance Date |
2021-02-19 |
Abatement Due Date |
2021-11-15 |
Current Penalty |
6963.0 |
Initial Penalty |
6963.0 |
Contest Date |
2021-03-17 |
Final Order |
2021-11-05 |
Nr Instances |
1 |
Nr Exposed |
4 |
Related Event Code (REC) |
Referral |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about November 13, 2020 - Process Building, 2nd Floor D Reactor, employees were exposed to caught-in hazards when lockout was not utilized when v-belts were replaced on the reactor D arm pulley. |
|
|